Grid-scale
Advertisement
Advertisement
Advertisement
Latest News
Advertisement
US Round-up: Fluence supplies 1.2 GWh Arizona project, NextVolt sells 1 GWh battery
NextVolt has offloaded a 1 GWh battery energy storage system (BESS) to Exus Renewables which will take on ownership long-term. Menawhile, the developers of a 1.2 GWh BESS in Arizona have partnered with Fluence for its GridStack Pro system.
All Grid-scale news
Edify gains nod for project with Australia’s longest -duration battery
Australian renewables developer Edify Energy has secured federal government approval for a solar and battery hybrid project in northwest Victoria that is to include what could be – at least for a while – the biggest eight-hour battery in the country.
Advertisement
Italian lender: Banks will tolerate 10% merchant operation of MACSE-tendered batteries
The opening session of the Italia Solare conference on finance and bankability for solar and battery energy storage systems (BESS) considered how the Mercato a termine degli stoccaggi (MACSE) auction could shape the Italian storage market. Elemens Partner Salvatore Casa predicted auction-set storage payments could be 'very far' below the €32,000 ($38,000)/MWh cap initially suggested.
Making BESS warranties work: Contracts vs. reality
Striking a careful balance between technical limitations, market ambitions, and contractual realism in operating battery energy storage systems (BESS) is no easy task. Rigid battery warranties can often be a make-or-break factor in BESS assest management. As a result, many industry players now argue that adopting a more flexible approach to warranties could unlock greater value from these inherently flexible assets.
Advertisement
US electricity body: Deploy grid-forming batteries now to avoid costly infrastructure later
Large-scale batteries with grid-forming software can sustain grid reliability as renewables replace synchronous fossil fuel generators, according to a report from the Energy Systems Integration Group (ESIG). The study focuses on test procedures to validate grid-forming capabilities.
Advertisement