Author
Cornelia Lichner
Advertisement
Articles written by Cornelia Lichner
BBDF 2025: Why time is running out for standalone storage
Regulatory changes in Germany are closing the window for standalone storage. Development is shifting toward colocated battery storage which entails increasingly complex optimization, as discussions at the Battery Business Development Forum in Frankfurt am Main indicated.
Jul 21, 2025
How to install big, medium-voltage-grid batteries in Germany within two years
The construction of a large battery energy storage system (BESS) can take 24 months – from site location to grid connection – if things go smoothly. Kaspar Klemm, of Swiss developer Terralayr, and Fabian Fink, of German peer FBS, explain the process.
Advertisement
Power electronics for customized battery energy storage
Startup p&e power&energy is offering multilevel inverter technology to manufacturers and integrators of battery energy storage systems (BESS). Interconnecting individual cells enables cost savings and the service life and efficiency of the systems, which can be individually configured for each application, can be increased.