Grid-scale
Advertisement
Advertisement
Advertisement
Latest News
Oman power company signs 2.7 GW PPA for continuous wind-solar-storage project
The gigawatt-scale solar, wind and battery project developed by O-Green Energy expected to provide round-the-clock power. It is part of a push from Nama Power and Water Procurement to secure 7 GW solar, 3 GW battery storage capacity by 2030.
2 hours ago
Advertisement
Sodium-ion vs lithium-ion BESS: Cost parity not before 2031
“Europe needs massive investments in energy storage to achieve true independence. This requirement cannot be met by a single technology, let alone by depending on a single geographic area. The goal is therefore to build a storage industry and a broader grid infrastructure under the control of Western countries. A strategic and ambitious goal that will take time,” Dario Bertagna, senior managing director and co-head of Clean Energy at Capital Dynamics, told pv magazine Italia.
Engie inaugurates its first battery system connected to a wind farm
The storage system is located next to the Kallpa Wind Farm in the municipality of Taltal, Antofagasta Region, and has a capacity of 57 MW / 285 MWh. This initiative is part of Engie Chile's strategy to expand its renewable energy and storage portfolio in the country.
India’s storage market shifts from tenders to execution
Ratul Puri, chairman of Hindustan Power, tells pv magazine that India’s battery energy storage system (BESS) market is moving from aggressive tendering toward large-scale project execution, as the country increasingly prioritizes grid integration, transmission readiness and long-term supply resilience.
All Grid-scale news
Advertisement
Advertisement
Australian utility-scale battery deployment surges past solar, wind – falls short of requirements
Big BESS is booming Down Under, with almost 5 GW of projects under construction in 2024, according to Rystad Energy. While encouraging, the analyst reports that the volume remains insufficient to overcome growing rates of renewable curtailment. “We have around 3 GW operational at the moment, but about half of that is still in commissioning. So you still only have 1.5 GW on the market where the average load is 23 GW,” Rystad Energy’s David Dixon tells ESS News.
Boralex plans li-ion and vanadium flow hybrid in France, Acciona colocates new and second-life EV batteries in Spain
Canada's Boralex will combine two battery types at an innovative site in France and Acciona Energía will study the performance of new, versus second-life, electric vehicle (EV) batteries at a stationary storage site in Badajoz, Spain.
Advertisement