Author
Advertisement
Articles written by Alessandra Neris
Brazilian grid operator sees 40 GW of renewable curtailment by 2030
Brazil's grid operator expects renewable energy curtailment to remain high through 2030, saying battery energy storage systems (BESS), transmission expansion, demand response and higher electricity consumption will be needed to absorb surplus solar and wind generation.
Advertisement
Advertisement
Sungrow: Brazil tops 500 MWh of distributed battery storage, 650 MWh more expected in 2026
The manufacturer cites exponential growth in energy storage across residential, commercial, industrial, and agribusiness segments, fueled by blackouts, falling costs, the white tariff, and evolving ANEEL regulations.
Huawei and SECPower partner to expand energy storage in Brazil
The agreement aims to promote battery energy storage systems (BESS) for the commercial, industrial and agricultural sectors in Brazil, and both companies are optimistic following the recent regulatory advances in the Brazilian electricity sector.
Brazil eyes April 2026 for first battery storage auction
A 20-day public consultation is anticipated to open in November to define the guidelines for the auction, which aims to contract 2 GW of battery energy storage systems (BESS). The initiative could unlock around R$10 billion ($1.85 billion) in investments.
Advertisement